This Year A Second Floor

07.05.07

Friedrich Freek GmbH expands.

(sh)

Menden.
"We are bursting at the seams", states Wolfgang Kaiser, managing director of Friedrich Freek GmbH. "We need more capacity, after all every company should keep something in reserve for orders at short notice."

Efforts to rent free areas in the company’s neighbourhood in Menden failed. Therefore the Germany-based company decided to extend on their own site. In the area, though, this is not possible, so it goes up into the air. The second production hall will be raised. Thus, additional space of 500 square metres is created. "Mainly we will expand the production", Kaiser explains. At the same time the washrooms and changing rooms in the cellar are enlarged and renovated. "So we can increase the workforce as well", Kaiser says and thinks about 12 to 16 new jobs on a long-term basis. This month the construction work is about to begin and it should be finished this year.
This Year A Second Floor (click to enlarge)
|+| enlarge picture
There is no space left on the site therefore a second floor is built on the rear production hall. WP photo: Martina Dinslage
back   upward
Fusszeile
Home | Company | Products | Fairs | News | Eucopet | Sitemap | Downloads | Contact | Imprint
Friedrich Freek GmbH
Sudetenstraße 9, D-58708 Menden
Germany
© 2008 Freek
www.freek-heaters.com
Tel +49 - (0) 23 73 - 95 90-0
Fax +49 - (0) 23 73 - 95 90-30






























10 Accessories 9 Open Wire Heating Elements 8 Flat Heating Elements 7 Controller 6 Thermosensors 5 Heating Bands 4 Tubular Heaters 3 Ceramic- and Quartz-Infrared Heaters 2 HotMicroCoil Heating Elements 1 Cartridge Heaters Home
  As favourite
  As homepage
  Print
  Help
  Recommend
Subscribe rss-feed  Subscribe rss
 
A enlarge
A normal
A diminish
In case of any queries our team will be happy to assist you!
Tel.: +49 2373 9590 0
Fax: +49 2373 9590 30
eMail: